5,000 capacity Launch Viewing Gallery is constructed in the form of a stadium, and placed at an appropriate location with clear line of sight to the two launch pads of the Sriharikota.
Project Cost: 1.73Cr
Project technical:
VRV: 300 HP
Make: Blue star
Copper Piping: 1300 Rmt
Indoor Machines: AHU (12000 & 15000 CFM)
Ducting with Insulation: 2372 Sqm.
© 2024 Air Solution Corporation